Haven’t been so active on my blog as I have been really busy with both work and with IESAF ry platform upgrades.
But now that that is completed (roughly 90% done) i can take a break with work related issues to say HOWDY from Finland. The sun is shining more and more and the days are getting longer and longer finally. The ice is breaking up in the harbours and the terraces at local bars are getting their patio chairs and tables cleaned and laying them out for customers to sit outside. ( a sure sign that winter is officially over )
UPDATE ON RENOVATIONS:
Yes, I haven’t posted much on the renovations of our building but a lot has been done. They are roughly 50% done with the “window exchange” for brand new ones and they have laid out the foundation frame work for the new balconys (which btw are roughly 2 meters by 4 meters – about the size of a small room) so I guess when all the work is done we can say our apartment is 4 rooms instead of 3 rooms.. ;)
Pics below of some of the work going on, etc..
picture of one of our doorways with a custom moat and bridge
some of the moat work being done for the foundation of the new balcony’s being dug up and framed
some more of the framework but closer
picture of our new balcony’s..were getting roughly about foot more than what it was before.. ;)
Windows
before and after
–